Settlement monitoring tracks vertical movement over time to assess the response of ground, fills, foundations and structures.
TTM TEST plans the field or laboratory programme according to project objectives, available ground information, access conditions and required engineering outputs. Measurements and observations are checked for consistency and presented in a project-specific technical report.
Inclinometer monitoring measures lateral ground or structural movement with depth and is widely used in geotechnical performance monitoring.
Settlement monitoring tracks vertical movement over time to assess the response of ground, fills, foundations and structures.
Displacement monitoring provides repeatable measurements of movement to support construction control and geotechnical risk management.
Piezometer monitoring measures pore-water pressure or groundwater head, providing critical information for seepage, stability and construction-control decisions.
Vibration monitoring records ground or structural vibration during construction and other activities to support control of project impacts.
Since 1994, TTM TEST has supported projects with geotechnical drilling, in-situ testing, CPT/SCPT/DMT/SDMT, geophysics, instrumentation, laboratory testing and engineering services. Experienced technical teams, modern equipment and disciplined reporting provide reliable data for engineering decisions.
TTM TEST supports projects with integrated site investigation, geotechnical drilling, in-situ testing, laboratory and engineering services.